The process and what to expect
Step 1: Pre-Development & Land Analysis
Purpose: To assess feasibility, yield, risk, and ROI potential before any formal design or entitlement work begins.
Services:
Feasibility Study: Market and site evaluation, absorption analysis, comparable rents/sales, and demand validation.
Site Due Diligence: Review of surveys, floodplain, topo, title, easements, encroachments, access, and nearby infrastructure.
Conceptual Site Planning: High-level layouts with parking ratios, loading access, fire lanes, building footprints.
Yield Modeling & Density Calculations: Determines rentable SF, FAR, and utility of land.
Infrastructure Capacity Review: Sewer, water, storm, electric — both availability and sizing.
Pro Forma Support: Input assumptions for construction cost, leasing assumptions, hold/sell strategies.
Zoning Use & Compliance Review: Confirms allowable uses, setbacks, height limits, parking, and landscape code.
Deliverables:
Site viability report
Conceptual site plan
Infrastructure memo
Preliminary OPCs, contingent on city/county negotiations and final contractor bids
Go/no-go risk matrix
Step 2: Entitlements & Regulatory Approvals
Purpose: To obtain all municipal and regulatory approvals needed to begin construction, including zoning and site-specific permissions. Important to note, Step 1 and 2 are done somewhat concurrently to the extent possible.
Services:
Zoning Coordination: Rezoning, variances, or conditional use permits (if required).
Site Plan Submittals: Coordinate initial submittals and revisions to meet jurisdictional codes.
Utility & Service Agreements: Water/wastewater agreements, electric providers, franchise coordination.
Environmental Review: TIA (Traffic Impact Analysis), noise, drainage, tree surveys, endangered species (as needed).
Public Hearings & Staff Meetings: Attendance at planning & zoning hearings, council meetings, and staff-level discussions.
City/County Coordination: Close coordination with planning, engineering, public works, and legal departments.
Deliverables:
Approved site plan
Zoning confirmation
Utility service commitments
Environmental compliance documentation
Permitting roadmap
Preliminary OPCs Round 2
Step 3: Civil Engineering & Infrastructure Design
Purpose: To produce and permit all technical site plans necessary for horizontal development.
Services:
Grading & Drainage Design: Full topographic modeling to manage water flow and maintain code-compliant slopes.
Utility Plan Design: Water, wastewater, fire lines, electric, gas — all coordinated and routed.
Stormwater System Design: Detention/retention ponds, underground storage, outfalls, and water quality devices.
Paving & Fire Lane Layouts: Drive aisle widths, turning radii, and emergency access compliance.
Construction Phase Erosion Control (SWPPP): Storm Water Pollution Prevention Plan.
Permit Coordination: Full submission sets and revisions through civil plan reviewers.
Deliverables:
Full civil plan set (sealed)
SWPPP plan
Hydrology reports
Final plat (if needed)
Approved construction plans
Final OPCs and Construction Bid Kickoff
Step 4: Architectural Design & Programming
Purpose: To develop attractive, code-compliant, and user-adaptable flex industrial buildings that serve multiple tenant types. Important to note, step 3 and 4 are done concurrently.
Services:
Schematic Design (SD): Building layout, basic massing, tenant mix, and circulation.
Design Development (DD): Structural planning, loading dock placements, storefront locations, and entry sequencing.
MEP Coordination: HVAC, electrical paneling, plumbing layouts, roof drains, and utility tie-ins.
Code & ADA Review: Ensures compliance with IBC, energy code, and accessibility requirements.
Façade Development & Branding Integration: Elevation design for front-facing retail/office, signage integration, and color palette.
Permit Submittals: Preparation and management of architectural permit sets.
Deliverables:
Full architectural plan set (sealed)
Site-specific design narrative
MEP coordination matrix
3D conceptual renderings (optional)
Permit-ready submittal set
Step 5: Fabrication & Material Sourcing
Purpose: To manage procurement, long lead items, and coordinate pre-fabricated components to save time and cost. This step is done towards the end of the combine step 3 & 4 but is also done somewhat concurrently after step 3 & 4 make approx. 80-90% progress. Expect a sizable deposit required at this point, generally 10-20% of materials. This is a standard request by most material suppliers and do budget between $100K and $300K as a non-refundable deposit to the material provider.
Services:
Metal Building System Coordination: Work with pre-engineered metal building manufacturers to finalize specs, lead times, and layout.
Tilt-Wall Vendor Integration (if applicable): Manage panel layout, cast-in-place coordination, and lift planning.
Structural Value Engineering: Identify alternative framing methods (CMU, steel joists, hybrid) to lower costs without sacrificing quality.
Material Pre-Ordering: Identify and pre-order long-lead items (e.g., steel, switchgear, HVAC units) to avoid construction delays.
Subcontractor & Vendor Vetting: Establish a procurement matrix with trusted suppliers.
Deliverables:
Final material procurement plan
Vendor contact matrix
Critical path material timeline
Manufacturer coordination logs
Step 6: Construction Management & Owner Representation
Purpose: To manage on-site construction with a focus on schedule, budget, safety, and quality — while protecting the owner’s interests. During this phase, we will work with our partners at Colliers and Flex Parks USA to help kick start the marketing, lease-up and brokerage step. That last step will be between client and property management company.
Services:
GC Selection or Oversight: Either bid out the GC role or manage a selected GC under FlexPro’s oversight.
Schedule Management: Use of Gantt charts and critical path methods to maintain progress and milestones.
Budget & Pay Application Control: Track costs against estimates, approve pay apps, and manage contingency.
RFI/Submittal Tracking: Ensure quick resolution of field questions and plan clarifications.
Inspections & Quality Control: On-site review of construction phases, punchlist creation, and performance verification.
Closeout Coordination: As-built drawings, warranties, O&M manuals, and turnover binder.
Deliverables:
Monthly construction report
Schedule updates
Budget status report
Punchlist and closeout binder
Certificate of occupancy